GREEN PAKISTAN PROJECT

Pakistani Flag

Factory Sustainability Journey

sheikhansports logo

sheikhansports

PSGMEA
Sialkot
Product Line
goal keeper gloves / fitness
Website
Visit Site

Sustainability Journey

Complete breakdown of verification stages

7 Stages
Mar
25
2025

Project Onboarding & Commitment

Success

Factory formally joins the Green Pakistan Project by submitting its application and confirms its willingness to participate and follow the structured sustainability improvement process in alignment with EU Green Deal, LkSG, and international due diligence principles.

Attachments
LOCKED
Application form Request Access
Apr
16
2025

Baseline & Declaration Submission

Success

The factory submits its Baseline & Declaration to present a clear picture of its current labour, environmental, and health & safety practices. This assessment captures key operational information, legal compliance, and existing management systems for the Green Pakistan Project Panel to evaluate present conditions and identify priority areas for improvement. By submitting the declaration, the factory confirms the accuracy of the information and shows its commitment to responsible and transparent operations.

Attachments
LOCKED
Baseline & Declaration form Request Access
Apr
25
2025

On-Site Verification & Advisory Visit

Success

A formal visit is conducted by Green Pakistan Advisory panel along with the association team to validate the baseline information submitted. During this visit, actual factory practices are reviewed, gaps are identified, and the team provides practical guidance on how to meet international sustainability expectations.

Attachments
LOCKED
1st Factory Visit Request Access
1st Factory Visit photo
May
29
2025

Digital Data Entry on Umbertine Platform

Success

The data including workforce details, safety conditions, environmental metrics, and production information is entered into the Umbertine software which works on SocialFair 2030 Approach. This helps to evaluate the standardized KPIs and forms the analytical basis for the factory’s Sustainability Report.

Attachments
LOCKED
Umbertine data submission Request Access
Jan
2
2026

First Sustainability Report (Draft) Submission

Success

After completing data entry on the Umbertine platform, the factory prepares its first Sustainability Report (Draft). This draft report was shared with the Green Pakistan Advisory Panel for a detailed review. The objective of this review was to obtain expert feedback, validate the reported data and receive guidance for strengthening the report in line with international sustainability and due-diligence expectations.

Attachments
LOCKED
Sustainability report Draft 1 Request Access
Jan
3
2026

Revised Sustainability Report (Draft) Submission after Technical Feedback

Success

After receiving structured feedback from Green Pakistan Project Panel, the factory incorporates the feedback and submits the revised version. This step ensures accuracy, completeness, alignment with international frameworks and readiness for final verification.

Attachments
LOCKED
Sustainability report Draft 2 Request Access
Jan
15
2026

Revised Sustainability Report (Draft) Submission after Technical Feedback

Success

After receiving structured feedback from Green Pakistan Project Panel, the factory incorporates the feedback and submits the revised version. This step ensures accuracy, completeness, alignment with international frameworks and readiness for final verification.

Attachments
LOCKED
Final Sustainability report Request Access